Not only have I always loved the excitement of learning something interesting at a newsworthy event, but I also love laying out spreads for publications. Here's my final spread (it was printed 16"x20").

Laying Asphalt on Loop 1.
It was an expose ...ahem, well, a story... about the construction project currently underway on Mopac (aka: Loop 1) and Duval. They've added a bridge to the area to allow for an extra auxillary lane and closed off (and since re-opened) an off-ramp at Duval.
During my story, I followed around the Project Engineer as they layed asphalt on the newly built lane.
For those not familiar, these are photos of what I used to do: construction inspection. I look back fondly on the days when I was outdoors all day learning new things about how a road gets built. Afterwards, I was moved indoors where I worked to design projects like this. Develop construction plans for Highway improvements on State facilities, road widenings, drainage design ... and on and on.
Here are a few of the photos shown in that spread.

Project engineer treading over a freshly compacted 5" lift of asphalt pavement as he heads over to the Asphalt Crew.

Looking through the rebar framework which will serve as reinforcement for new traffic rail on Loop 1, workers have spray-painted instructions to "saw-cut" the existing pavement structure in order to "tie-in" new pavement. You can see that the pavement has already been saw-cut (at a depth of 18") and awaits new asphalt.

Sitting amidst wooden forms and rebar, TxDOT Construction Inspector coordinates with Contractor superintendent about the paving operation underway on Southbound Loop 1 at the Duval Street exit ramp.
This ramp has since been opened to the public!